Select currency:
Cart empty

CFR

 

Cost and Freight (named place of delivery)


cfr-en

In Incoterm CFR the seller delivers the goods on board of a ship in the port of shipment, but he also manages and pays the cost of freight to the port of destination. Therefore, the point where the risk of transport is transmitted (port of shipment) is different from the point to which the seller bears the costs of transport (port of destination). The terminal costs and export clearance in the port of shipment are borne by the seller.

The only difference between Incoterms CFR and CIF is that in CFR the seller is not obliged to hire an insurance transport from the port of shipment to the port of destination.

CFR is a sea transport Incoterm used mainly for general cargo and large volumes of goods. When the goods are transported in containers and the place of delivery is the port of destination, Incoterms 2010 rules advised to use CPT instead of CFR, because the containers are usually delivered at the terminals of the ports, that is, before being placed on board of the ships.


Practical Guide to Incoterms 2010




Download Incoterms 2010 Chart
 
Practical Guide to Incoterms 2010
 
Models of International Contracts
 
Contracts for China (English-Chinese)
 
Negotiation Guides in 70 countries
 
Warning
  • Info: COM_VIRTUEMART_ASSIGN_VM_TO_MENU